Nel ASA Receives Over USD 50 Million Order for Hydrogen Projects in Norway

Nel Hydrogen US, a subsidiary of Nel ASA (OSE), has received a purchase order valued at more than USD 50 million for proton exchange membrane (PEM) electrolyzers from the HyFuel and Kaupanes hydrogen projects in Norway. Both projects are developed by Hydrogen Solutions AS (HYDS) in collaboration with their respective partners. Each facility will have a capacity of 20 megawatts (MW) using Nel’s MC 500 containerized PEM systems, totaling 40 MW across the two sites. According to the company, the order represents its largest contract for PEM equipment to date and its second-largest purchase order overall.
Support from Enova for both projects
The HyFuel project, owned by HYDS, Sogn og Fjordane Energi AS, and Fjord Base Holding AS, will be located at the offshore supply base in Florø, Kinn municipality. The project has received NOK 180 million in support from Enova. The Kaupanes project, owned by HYDS, Dalane Energi AS, and Eigersund Næring og Havn KF, will be situated in the Kaupanes industrial area in Eigersund municipality. It has been awarded NOK 206 million in Enova funding.
HYDS, based in Leirvik, Stord, develops and operates facilities for green hydrogen production powered by renewable energy sources. The company’s operations cover the full hydrogen value chain, from development and power sourcing to electrolysis and distribution.
Production of the PEM systems in Wallingford, United States
HYDS Chief Executive Officer Frode Kirkedam described the contracts as “an important step in advancing the green hydrogen market in Norway and the Nordics,” while Nel ASA President and CEO Håkon Volldal said the company looked forward to collaborating with HYDS on the projects. Volldal added that the order underscores the competitiveness of Nel’s PEM platform and provides a key reference for future large-scale hydrogen projects.
The PEM systems will be produced at Nel’s automated facility in Wallingford, United States. Deliveries are scheduled to begin in the second half of 2026 and continue through 2027, with both hydrogen plants expected to begin commercial operations in early 2028. Nel stated that the order is anticipated to positively impact its financial results, product costs, and service operations in Europe.
Source
Newsletter
Hier informieren wir regelmäßig über alle wichtigen Entwicklungen im Bereich des Wasserstoffs, der Brennstoffzelle und des Elektrolyseurs.
Downloads
Hier informieren wir regelmäßig über alle wichtigen Entwicklungen im Bereich des Wasserstoffs, der Brennstoffzelle und des Elektrolyseurs.
Whitepaper: In-line Viscosity Measurement
Download a white paper on innovative solutions in the areas of real-time process monitoring and quality assurance
