Shell to Build 100-Megawatt Renewable Hydrogen Electrolyser in Germany

Shell Deutschland GmbH has announced a Final Investment Decision (FID) to advance REFHYNE II, a 100-megawatt renewable proton-exchange membrane (PEM) hydrogen electrolyser at the Shell Energy and Chemicals Park Rheinland in Germany. This project aims to produce up to 44,000 kilograms of renewable hydrogen per day to support the decarbonisation of the site’s operations. The electrolyser is expected to be operational by 2027.

Support through the EU Horizon 2020 research and innovation programme

The REFHYNE II project is supported by policies such as the European Union’s binding targets for renewable hydrogen use and the German Federal Government’s regulatory framework. Additionally, the project has received funding from the EU’s Horizon 2020 research and innovation programme. Huibert Vigeveno, Shell’s Downstream, Renewables, and Energy Solutions Director, commented on the development, stating that the investment in REFHYNE II aligns with Shell’s strategy to reduce emissions and underscores the company's commitment to the hydrogen economy.

Reduction of Scope 1 and 2 emissions at the facility

The renewable hydrogen produced will be used at the Shell Energy and Chemicals Park to create energy products like lower carbon intensity transport fuels. This initiative aims to reduce Scope 1 and 2 emissions at the facility and may also contribute to lowering industrial emissions in the region in the future. Shell, along with its project partners ITM and Linde, brings extensive experience in developing, constructing, and operating renewable hydrogen projects in Europe. REFHYNE II builds on the success of the 10-megawatt PEM electrolyser REFHYNE I, which started operations in 2021. Preparations for REFHYNE II have included detailed engineering plans, on-site groundwork, and connecting to existing infrastructure.


Additional Information: Shell plans to invest $10-$15 billion between 2023-2025 in low-carbon energy solutions, including e-mobility, low-carbon fuels, renewable power generation, hydrogen, and carbon capture and storage. In 2023, Shell invested $5.6 billion in low-carbon solutions, comprising 23% of its capital spending. The investment in REFHYNE II will be included in Shell’s capital expenditure guidance and meets the company’s internal rate of return criteria for its Renewables & Energy Solutions business.


Key partners in the REFHYNE II project include ITM Power (Trading) Ltd, ITM Power Germany GmbH, Linde GmbH, TECNALIA, ETM, SINTEF AS, and CONCAWE. The hydrogen produced is expected to meet the EU’s requirements for renewable fuels of non-biological origin (RFNBO).


Shell is also constructing the Holland Hydrogen I in the Netherlands, a 200-megawatt renewable hydrogen plant that will be one of Europe’s largest once completed.


Source

Shell

Newsletter

Hier informieren wir regelmäßig über alle wichtigen Entwicklungen im Bereich des Wasserstoffs, der Brennstoffzelle und des Elektrolyseurs.

Downloads

Hier informieren wir regelmäßig über alle wichtigen Entwicklungen im Bereich des Wasserstoffs, der Brennstoffzelle und des Elektrolyseurs.

Whitepaper: In-line Viscosity Measurement

Download a white paper on innovative solutions in the areas of real-time process monitoring and quality assurance